Wednesday, January 14, 2009

detartrated

As I sit here getting a bit loopy from the toluene and methyl ethyl ketone fumes from the contact cement I am using to attach the oak veneer to my bar top, all I can think of is: shouldn't palindrome be spelled 'palinilap?'
TACOCAT

Monday, January 12, 2009

A flurry of bar building activity

I made a good deal of progress on my bar yesterday and today. Since I am doing all of my cutting in my shed or garage and the temperatures are expected to plummet to -15°F, I felt compelled to do as much cutting as I could. I like my testicles and prefer not to freeze them off.

On Sunday, I installed 1/2 inch plywood on the front of the bar. Tonight I installed the bar top (5/8 inch plywood) and cut (but didn't install) 1/4 inch oak veneer. I need to figure out the best way to attach the oak veneer. Obviously, screwing it or nailing it in place would defeat the purpose of the veneer. I will probably glue it, but I need to figure out what type of glue to use.

Here are a few pictures.

After I attach the veneer, I will install trim, stain it, lacquer of the surface real good, and install the kegerator. I'm getting close.

Saturday, January 10, 2009

'tis now a wet bar

I worked on my bar tonight and installed a sink, complete with drain. Here is a picture of the sink with the water running just to prove that it works.

Here is a picture of the "main prep" area that I tiled and grouted.

As you can see, my work area is a bit messy. That's because I have not taken the time to clean. Time is too valuable right now to clean. I need to get ready for the new semester that starts on Monday. Obviously, that's been my #1 priority.

Also, sitting in my garage, I have all of the plywood and oak veneer I need to nearly finish the beast. After that comes trim, but that is only cosmetic.

Thursday, January 8, 2009

Learning things...twice.

Have you ever learned something twice?

Have you ever learned something, forgot it, and learn about it later only to realize you already knew that?

Sometimes, it can be kind of embarrassing. Especially if you tell something you are convinced is true only to find out you knew better. That happened to me today.

At The Curious Wavefunction, Ashutosh posted about an article in the New York Times about radio signals and early stars. He identified a rather curious statement in the article:
Dust grows over time as stars manufacture heavy elements called metals, like carbon, silicon and oxygen, that make up dust and then spit them out into space.
I checked out the article and found the offending sentence and it offended my delicate chemistry teacher sensibilities. Carbon, silicon and oxygen are most decidedly NOT metals, nor are they "heavy elements."

I decided I had finally found my purpose on this planet and decided to send the author an email and personally advance his education. This is what I sent him:
Mr. Overbye,
In a recent article you wrote: "Dust grows over time as stars manufacture heavy elements called metals, like carbon, silicon and oxygen, that make up dust and then spit them out into space." Carbon, silicon and oxygen are most certainly NOT metals nor are they heavy elements.
Best wishes,
Eric Woller, Ph.D.
I added the Ph.D. part to make sure he knew I wasn't messing around. I felt good. I had taught some big shot NYT science correspondent some damn fine chemistry. He was nice enough to reply. This is what he sent me:
Astronomers refer to anything heavier than helium as metals.
Thanks for writing,
Dennis
That was when I slapped my forehead and realized...I knew that. I'm such an idiot.

While one can argue that labeling anything heavier than helium as a metal is silly, that's what astronomers and the like do. I knew that, but it didn't stop me from displaying some degree of ignorance.

So, I learned that little fact...again.

Wednesday, January 7, 2009

I love my Mac

"I'd buy anything if it's shiny and from Apple."

Tuesday, January 6, 2009

Bar progress

As I mentioned yesterday I am building a bar in my basement. Even though I really should be getting ready for the new semester, I decided to install some tile on my bar (I am such a terrible procrastinator).

I have installed a lot of ceramic tile in the past 5 years. I did our kitchen, dining room, 2 entry ways, a shower and now on and under my bar. I own a tile saw and have used it a lot. I do all of my tile cutting outside because a tile saw is a bit messy. A tile saw is a wet saw meaning the blade cooled by water. The bottom inch of the blade dips into a reservoir of water.

As evidence that Minnesota winters are cold, my tile saw froze up between cuts. It was only outside for a total of 3 hours, but that was enough to freeze the blade in the "not moving" position when I hit the switch.

Tomorrow I will add grout. That job sucks, but it will help me procrastinate.

Monday, January 5, 2009

My slooooooow bar project.

When we bought our house several years ago, the entire basement was unfinished. It only took me about 4 years to finally finish it. Money and the arrival of children really slowed things down.

Right now, I'm building a bar in my basement. I planned for the eventual addition of said bar. I put plumbing and electrical in all the right places.

I'm not a professional handi-man, but I would like to think I am entirely capable. My main drawback is that I am very slow and methodical. I will literally spend hours thinking and planning. That's why my bar wasn't finished in July as planned.

The first step was to cut a perfectly good chunk of carpet out of our newly laid carpet and replace it with slate tile.

The second step was to frame in the bar. That's where I am right now.

Here are some pictures:

The bar in it's current state of disarray:
Where the sink will go:
The other side of the bar. I'll be tiling the surface with small slate tile.
Where the kegerator will go:
The kegerator that will go into the bar:
My kids think they can hammer screws into scraps. Silly kids: